Advanced Commissioning Tools
Innovative instrumentation-software providing complete performance testing capabilities of data center electrical infrastructure components.
Comprehensive
Multi-purpose instrumentation provides all the functionality needed for commissioning - in one compact kit.
Professional
Expert level capabilities allowing full performance-specification testing of the electrical characteristics of each machine.
Smart
Designed to organize, streamline and speed the commissioning process.
Immediate
Fast analysis features, allowing you to immediately verify test results, while you are testing the machine.
Proven
KTS has been used to commission thousands of UPS, generators, STS and PDU's.
Electrical Commissioning
The primary focus of KTS is full performance testing of the components that make up the electrical infrastructure. KTS is specifically designed for commissioning:
-Engine Generator Sets
-Uninterruptible Power Supplies (UPS)
-Static Transfer Switches (STS, ASTS)
-Power Distribution Units (PDU)
-Automatic Transfer Switches (ATS)
-Rectifiers
-Inverters
Multi-Function Instrumentation
Does the work of multiple instruments
KTS does the work of Power Monitors, Chart Recorders, Scope meters. Each instrumentation mode is optimized for data center commissioning work.
- True RMS measurements of voltage and current.
- Frequency
- Detailed Harmonics - THD
- Power - Watts, VA, VAR, PF
- DC volts, DC amps
- Power meter - Snapshot
- Waveform recorder
- Power meter - strip chart recorder
- Unique instrumentation modes for data center testing.
More than one type of instrumentation is necessary for testing to specifications of many data center components. Full performance testing of UPS and Static Switches requires high resolution waveform capture instrumentation to be able to measure sub-cycle events. KTS provides this functionality in one compact kit.
High Resolution Results
Enables Sophisticated Analysis
High Resolution Data Capture allows you to gain insight into the internal workings machine.
Fast Sample Rates. All power measurements are made at >15K samples per second.
Not only is high resolution nice to have, it is necessary for complete performance testing! (Sub-Cycle Events for UPS and STS testing.)
NIST Traceable Calibration Certificate included.
Task Optimized Instrumentation
Customized Tools
This is just one example - An UPS battery discharge test.
The graph and meters continuously update in real time, while the test is in progress.
Requirements
KTS software runs on:
- Windows XP (32 bit only)
- Windows Vista (32 bit and 64 bit)
- Windows 7 (32 bit and 64 bit)
- Windows 10
Proven Results
Since 2004, thousands of Data Center commissioning and testing projects have been successfully performed using KTS.
Better Tools
The only instrumentation package specifically designed for the needs of data center electrical commissioning.
We do the boring stuff
Reporting is labor intensive, error prone and time consuming. Now, it's taken care of for you. Consistently sharp and precise reports. Every time.